🗓 2-Day Executive Clinic | 16–17 September 2026

Demurrage & Shipment Reliability Recovery Clinic

Turning Cargo Delay into Margin Protection, Contract Execution & Cash Recovery. Framework lintas fungsi terpadu untuk tim pengapalan batu bara, nikel, dan mineral curah.

Lokasi Jakarta
Jadwal 16–17 Sep 2026 (08.30–17.00)
Format Sesi War Room & Real Case Clinic
Kapasitas 30 Kursi

Berapa Biaya Sebenarnya dari 24 Jam Vessel Waiting?

Keterlambatan kapal langsung menggerus margin keuntungan perusahaan. Simulasi contractual demurrage standar US$ 20.000/hari:

6 Jam Delay
US$ 5,000
12 Jam Delay
US$ 10,000
24 Jam Delay
US$ 20,000
48 Jam Delay
US$ 40,000

*Belum memperhitungkan potensi deadfreight, biaya tunggu armada tongkang & tugboat, rehandling stockpile, hingga denda penahanan dokumen ekspor/lab.

Apakah Hambatan Ini Sering Dihadapi Tim Anda?

Kesiapan Kargo vs Kapal Asimetris: Kargo belum siap di stockpile/jetty saat laycan & ETA kapal sudah mulai berjalan.
Sengketa Klausul Laytime: Perbedaan interpretasi validitas NOR, turn time, SHINC/SHEX, serta pro-rata crane dengan buyer/charterer.
Silo Operasional: Tim Operations, Commercial, Shipping, dan Legal membaca root cause secara terpisah tanpa satu sumber data valid.
Dokumentasi Bukti Lemah: Berkas SOF, time sheet, weather report, dan surat protes tidak terstandarisasi saat menghadapi counter-claim demurrage.

Direkomendasikan Hadir Sebagai Tim Terpadu:

Menghadiri clinic sebagai delegasi 3–5 orang lintas fungsi terbukti melahirkan SOP eksekusi yang langsung dapat diterapkan pasca-pelatihan.

Shipping & LogisticsSuperintendent, Port Captain, Chartering Manager
Commercial & TradingMarketing Trader, Contract Administrator, Coal/Mineral Sales
Mine Operations & QA/QCJetty Master, Stockpile Superintendent, Surveyor Coordinator
Legal & FinanceCorporate Counsel, Trade Finance, Demurrage Settlement Officer

5 Transformasi Nyata Pasca Clinic

Membangun disiplin eksekusi pengapalan berbasis mitigasi risiko dan pemulihan arus kas:

1. SEE EARLIER Deteksi risiko potensi demurrage 24–72 jam sebelum vessel tiba di anchorage.
2. DECIDE FASTER Ambil keputusan kalkulatif: proceed, hold, partial load, atau renegosiasi laycan.
3. COUNT ACCURATELY Hitung presisi laytime, demurrage, despatch, dan deadfreight tanpa sengketa angka.
4. PROTECT THE POSITION Kunci kelengkapan bukti hukum (NOR, SOF, time sheet, weather log & survey protest).
Eksklusif: Bring Your Own Shipment Case (War Room Clinic) Setiap korporasi diperkenankan membawa 1 kasus shipment nyata (dapat dianonimkan) untuk dibedah langsung bersama instruktur: mulai dari audit kronologi dokumen, kalkulasi eksposur kerugian, hingga skenario negosiasi klaim recovery.

Agenda Eksekutif 2 Hari

Kurikulum terstruktur yang menghubungkan realitas tambang/pelabuhan dengan hukum maritim komersial.

DAY 1 — 16 September 2026
Leakage, Readiness & Money Logic

  • 1. Shipment Leakage Chain Memetakan titik awal kebocoran margin: dari stockpile quality, QA-QC sampling, jetty readiness, hingga vessel berthing.
  • 2. Cargo & Vessel Readiness Gate Protokol verifikasi T-72, T-48, T-24 jam: draft survey, grab/crane capacity, armada tongkang, dan kesiapan dokumen ekspor.
  • 3. Laycan, NOR, Laytime & Delay-to-Money Validitas NOR, turn time, SHINC/SHEX, pro-rata crane/grab breakdown, dan kalkulasi laytime standar BIMCO.
  • 4. Commercial Decision Board Kapan harus loading penuh, partial load, hold vessel, atau deklarasi renegosiasi laycan dengan pertimbangan deadfreight.

DAY 2 — 17 September 2026
Claims, Evidence & Recovery

  • 5. Demurrage, Despatch & Contract Exposure Penerapan prinsip *Once on Demurrage Always on Demurrage* dan mitigasi saat sengketa operasional memasuki ranah hukum.
  • 6. Evidence Pack Clinic Standardisasi berkas: audit Statement of Facts (SOF), time sheet, barge log, survey report, dan surat penolakan klausul.
  • 7. 72-Hour Shipment Recovery War Room Simulasi penanganan krisis: perubahan mendadak ETA, kargo short, hasil lab tertunda, cuaca buruk, dan tekanan pembeli.
  • 8. Case Clinic & Recovery Charter Bedah kasus shipment delegasi dan perumusan *Shipment Reliability Recovery Charter (30/90 Days Action Plan)*.

Instruktur & Praktisi Penguji

Dipandu oleh praktisi kawakan dengan rekam jejak puluhan tahun di industri pengapalan curah global.

Mukhlisin Aziz

Lead Faculty — Dry Bulk Shipping & Chartering Execution

30+ tahun pengalaman eksekutif di industri dry bulk shipping chartering, operations, dan business development. Mantan eksekutif senior di PT Kaltim Prima Coal (KPC), Rio Tinto Shipping, NORDEN Shipping Singapore, dan Lauritzen Bulkers Singapore.

Novy Rahmat Triana

Faculty — Marine Claims, Cargo Insurance & Dispute Recovery

Praktisi klaim maritim senior dengan spesialisasi mendalam pada Hull & Machinery, Cargo Insurance, P&I Club procedures, General Average, serta audit mitigasi risiko sengketa kontrak pengapalan komersial.

Pilihan Skema Investasi Delegasi

Direkomendasikan mendaftar sebagai tim inti (Operations, Shipping, Commercial, Legal, Finance) demi keselarasan SOP.

Early Bird
Rp 7.250.000
per peserta (slot terbatas)
Normal Rate
Rp 8.500.000
per peserta reguler
Team of 3
Rp 19.500.000
total nett (tim 3 orang)

*Investasi mencakup: Akses 2 Hari Clinic, Recovery Calculator & SOP Templates, Lunch & Coffee Breaks, serta Sertifikat Resmi Eksekutif.

Tersedia Faktur Pajak Resmi & Proforma Invoice untuk kebutuhan vendor registrasi korporasi.

Formulir Registrasi & Permohonan Proposal

Lengkapi data PIC di bawah ini. Sistem akan menyusun pesan reservasi resmi ke WhatsApp PIC Kelas Tambang: Fransisca (0858-8003-0937).

16–17 SEP 2026 Executive Clinic
Daftar Sekarang